top of page

OUR EIGHT-STEP SUPPORT PROCESS

7

Handover and Commissioning

Making sure that you get the development you deserve.

6-step-icon-5_edited.png
Image by Arthur Lambillotte

Uniti will fully support the handover of the system, ensuring it is compliant and passes performance acceptance testing.

WHAT'S COVERED:

  • Site Inspections, install and Quality Check: Plant room, Distribution Pipework, HIU, Insulation

  • Commissioning  and compliance checks: Method Statements, Water Treatment, Plantroom and Paperwork Certificates

  • Acceptance Testing (Build Phase visits at handover)

  • Performance Gap reconciliation with Main Contractor

  • Design verification and assurance

  • Review of Operational and Maintenance (O&M) Manual

Image by Sigmund
“You can dream, create, design, and build the most wonderful place in the world. But it requires people to make the dream a reality.” 

WALT DISNEY

bottom of page